← Board Final test
PRD-26-0082
120 × SEVEN Base Unit — UK · hardware revision C · firmware 7.3.9 · raised against SO-26-0216
What passing this build does
· Consumes 14 component lines out of Ferrymead stock
· Mints 120 device records, each with its own Luhn-valid IMEI and CSID
· Draws 120 SIMs from the pool and pairs ICCID, IMSI and number onto each unit
· Pushes every record to SmartCare, and files the rejections in the reconciliation queue
· Receives 120 finished units into the store under a new batch number
SIM pool: 40 available for this
entity — 80 units would be built unpaired and flagged.
Material
$21,450
14 lines at standard cost
Bench time
$3,875
68 h booked · est 68 h
Cost per unit
$211.04
Standard cost is $189.80
At list
$57,000
55.6% gross before provider discount
Due
07 Sep
15 days to go
Rev C boards — the last of the rev-C stock. Rev D tooling lands with PO-26-0300.
Bill of material
14 of 14 lines staged
| Component | Required | Issued | Free | Cost | |
|---|---|---|---|---|---|
| PCBA-SEVEN-C SEVEN main PCBA — rev C | 120 | 120 | 123 | $8,616 | |
| MOD-LTE-CAT1 LTE Cat 1 module — dual SIM | 120 | 120 | 77 | $4,608 | |
| ENC-SEVEN-TOP SEVEN enclosure — upper | 120 | 120 | 417 | $1,368 | |
| ENC-SEVEN-BASE SEVEN enclosure — lower | 120 | 120 | 406 | $1,296 | |
| BAT-NIMH-40 NiMH backup battery pack — 40 h | 120 | 120 | 81 | $2,232 | |
| PSU-UK Plug pack — UK 5 V 2 A | 120 | 120 | 119 | $1,092 | |
| ANT-869 869 MHz RF antenna | 120 | 120 | 1,036 | $408 | |
| ANT-LTE LTE antenna — internal | 120 | 120 | 637 | $624 | |
| SPK-8R Speaker — 8 Ω 2 W | 120 | 120 | 388 | $348 | |
| MIC-EL Electret microphone capsule | 120 | 120 | 730 | $174 | |
| SIM-TRAY Dual SIM tray assembly | 120 | 120 | 625 | $252 | |
| LBL-CUST Customised device label | 120 | 120 | 459 | $55 | |
| UG-SEVEN SEVEN user guide | 120 | 120 | 849 | $154 | |
| CTN-SEVEN SEVEN retail carton | 120 | 120 | 472 | $223 | |
| Material at standard cost | $21,450.00 | ||||
Bench time
Booked at each technician's own hourly rate.
Assembly 40 h 48 min $2,346 Final test 16 h 19 min $963 Kitting 10 h 53 min $566
| Who | Stage | Minutes | Cost |
|---|---|---|---|
| Leon Faalogo | Assembly | 1,224 | $1,101.60 |
| Dave Ngatai | Final test | 979 | $962.68 |
| Mei Tanaka | Assembly | 1,224 | $1,244.40 |
| Joe Brennan | Kitting | 653 | $565.93 |
| Total | 4,080 | $3,874.61 | |
Book bench time
Costed at that technician's own hourly rate the moment it is booked.